The parts all came in and it was time to get the new-to-us trailer updated and adjusted, and get the Jon Boat on it. I readjusted the front winch location, moved the spare tire bracket, readjusted the carpeted rails for the boat to rest on, installed new wheels/tires, packed the wheel hubs with grease and painted them, installed new LED lighting, installed a new Reese tongue jack and wheel, and repaired a ground wire issues in the wiring harness. It turned out great and I can now move the boat around with one hand. All together, I guess we have about $500 in the whole trailer project, and it'll now alow us to sell that all-aluminum Triton MC trailer and get it out of the yard :-)